I'm Trevor, a design engineer based in SF
Currently I'm designing AI tools for lawyers at Supio
Recent thoughts
It is easy to generate experiences; staying inside a brand and a system as they grow is the hard part. So I built a foundation an agent can work with. Claude Design drives the role-named semantic tokens, and Claude Code compiles that contract into CSS variables and a typed export, so there is no drift between design and code.
Work
- B2BLegal AIAgentic interfaceDocument generationView case study
Legal documents carry real consequences. Every citation, every clause, every formatting choice reflects a firm's credibility. I design agentic systems that let legal professionals direct autonomous document generation, shaping output through conversation rather than assembling it by hand.
- B2BLegal AIDocument assemblyAgentic interfaceView case study
Exhibit packages are foundational to litigation. Every document, every page, every sort order reflects case strategy and firm convention. A missing record or misordered section can undermine a demand letter that took weeks to prepare. I designed the system that lets legal professionals assemble court-ready exhibit packages from thousands of case documents, starting from manual operations and ending in conversational automation.
- B2BLegal AIKnowledge mgmtView case study
Legal AI drafting is only as good as its reference material. A firm's winning demand letters, formatting templates, and best work product are what separate generic AI output from drafts that match the firm's voice and structure. Without a reliable way to provide those references, every generated document requires heavy rework.
- B2B2CProductivityAgenticConnectorsView case study
Lindy is an AI assistant platform. Skills are what the assistant can do on your behalf: check calendars, triage an inbox, chase an invoice. The Skills library is where people find them, understand them, and decide to use them.
- B2BFintechAgenticView case study
Tapcheck is an earned wage access platform. Mastercard approvals, a core revenue driver, required payroll managers to review and approve employee requests through the employer portal.
- ReportingExportView case study
A bulk export tool that lets enterprise clients select multiple entities and export deductions in seconds, replacing a tedious one-at-a-time process.
- TransferView case study
Tapcheck’s core transfer flow—how employees cash out earned wages—was the primary revenue driver. Transfer errors and confusing UX were eroding success rates and generating heavy CS volume.
- SoftwareProductivityView case study
Solace is a German civil engineering startup building a proprietary project management platform. Generic tools like Asana and Monday failed to meet industry-specific needs around compliance, equipment tracking, and multi-country coordination.
- SocialMessagingView case study
MSG is an avatar-driven social platform for camera-shy gamers and introverts who want to share expressive reactions without the anxiety of being on camera.
- Software devView case study
Qualcomm, a global leader in wireless technology, needed to manage a rapidly expanding portfolio of 1,000+ concurrent projects. Legacy tools and fragmented systems created inefficiencies across capacity planning, financial tracking, and project visibility.